Difference between revisions of "USS Achernar (AKA-53)"

From Conservapedia
Jump to: navigation, search
(clean up & uniformity)
 
(10 intermediate revisions by 10 users not shown)
Line 1: Line 1:
Achernar (AKA-53) was laid down under a Maritime Commission contract (MC hull 208) on 6 September 1943 at Kearney, N.J., by the Federal Shipbuilding and Drydock Co.; launched on 3 December 1943; sponsored by Mrs. Adela Rogers St. John; acquired by the Navy on 29 January 1944; and commissioned on 31 January 1944, Comdr. H. R. Stevens in command.
+
'''Achernar (AKA-53)''' was laid down under a Maritime Commission contract (MC hull 208) on 6 September 1943 at Kearney, [[New Jersey]], by the Federal Shipbuilding and Drydock Co.; launched on 3 December 1943; sponsored by Mrs. Adela Rogers St. John; acquired by the Navy on 29 January 1944; and commissioned on 31 January 1944, Comdr. H. R. Stevens in command.
  
+
Following conversion and fitting out at the [[New York]] [[Navy]] Yard, the attack cargo ship got underway on 28 February and held shakedown in the Chesapeake Bay. On 13 March, she arrived at [[Staten Island]], [[New York]]—where she loaded cargo and embarked Army personnel for transportation to [[Great Britain]]— and stood out to sea on the 19th, with Convoy CU-18. She arrived at Swansea, [[Wales]], on 30 March and spent the next two months transporting cargo and personnel between various ports in the [[United Kingdom]] in preparation for the Normandy invasion.
 
+
Following conversion and fitting out at the New York Navy Yard, the attack cargo ship got underway on 28 February and held shakedown in the Chesapeake Bay. On 13 March, she arrived at Staten Island, N.Y.—where she loaded cargo and embarked Army personnel for transportation to Great Britain— and stood out to sea on the 19th, with Convoy CU-18. She arrived at Swansea, Wales, on 30 March and spent the next two months transporting cargo and personnel between various ports in the United Kingdom in preparation for the Normandy invasion.
+
 
[[Image:USS Achernar.jpg|right|350px|USS Achernar]]
 
[[Image:USS Achernar.jpg|right|350px|USS Achernar]]
  
The last week in May found Achernar in Plymouth, England. On 1 June, she was designated the 1st Army's headquarters ship. On 6 June, she steamed across the English Channel and, at 1609, anchored in her preassigned position in Baie de la Seine, France. For the next few days, she acted as a nerve center for troops fighting for a foothold in France. On 11 June, the 1st Army's headquarters disembarked; and, at 1148, Achernar got underway for England. After a three-day respite in Plymouth, the ship moved to Roseneath, Scotland, to take on the cargo and personnel of two construction battalions. On 19 June, she returned to Plymouth to onload materials to repair damaged assault craft and, on 22 June, got underway for the assault area in France. While on station, she Underwent several enemy air attacks. The cargo ship again left the French coast on 29 June to return to England and arrived in Plymouth on 1 July. On 5 July, the ship was ordered to sail as a part of Task Group (TG) 120.6, which was bound for the Mediterranean to support the invasion of southern France. The ship entered the harbor at Oran, Algeria, on 10 July; but, six days later, sailed to Naples. After loading operations there, she switched to an anchorage at Castellamare, Italy, on 2 August. Here, she embarked personnel of the 36th Division and proceeded to sea on the 13th for the assault in southern France. On the morning of 15 August, her crew commenced discharging her cargo and sending it to the beaches. The next day, after finishing the delivery of cargo, she received casualties on board and embarked 13 German prisoners of war before getting underway at 2100 to return to Naples.
+
The last week in May found Achernar in [[Plymouth]], [[England]]. On 1 June, she was designated the 1st Army's headquarters ship. On 6 June, she steamed across the [[English Channel]] and, at 1609, anchored in her preassigned position in Baie de la Seine, France. For the next few days, she acted as a nerve center for troops fighting for a foothold in [[France]]. On 11 June, the 1st Army's headquarters disembarked; and, at 1148, Achernar got underway for England. After a three-day respite in Plymouth, the ship moved to Roseneath, [[Scotland]], to take on the cargo and personnel of two construction battalions. On 19 June, she returned to Plymouth to onload materials to repair damaged assault craft and, on 22 June, got underway for the assault area in France. While on station, she underwent several enemy air attacks. The cargo ship again left the French coast on 29 June to return to England and arrived in Plymouth on 1 July. On 5 July, the ship was ordered to sail as a part of Task Group (TG) 120.6, which was bound for the Mediterranean to support [[Operation Anvil|the invasion of southern France]]. The ship entered the harbor at [[Oran]], [[Algeria]], on 10 July; but, six days later, sailed to [[Naples]]. After loading operations there, she switched to an anchorage at Castellamare, Italy, on 2 August. Here, she embarked personnel of the 36th Division and proceeded to sea on the 13th for the assault in southern France. On the morning of 15 August, her crew commenced discharging her cargo and sending it to the beaches. The next day, after finishing the delivery of cargo, she received casualties on board and embarked 13 [[German]] prisoners of war before getting underway at 2100 to return to Naples.
  
+
For the next two months, Achernar continued making trips from Naples and Oran to points along the southern coast of France. On 25 October, she sailed from Oran westward through the Strait of Gibraltar towards the United States. She arrived at Hampton Roads on 8 November and underwent repairs and overhaul at the Norfolk Navy Yard. On 7 December, Achernar got underway for a brief period of trials and exercises in [[Chesapeake Bay]]. The ship returned to Norfolk on 11 December, took on cargo, and got underway on 18 December. She transited the [[Panama Canal]] on Christmas Day 1944 and arrived at [[Pearl Harbor]] on 10 January 1945.
 
+
For the next two months, Achernar continued making trips from Naples and Oran to points along the southern coast of France. On 25 October, she sailed from Oran westward through the Strait of Gibraltar towards the United States. She arrived at Hampton Roads on 8 November and underwent repairs and overhaul at the Norfolk Navy Yard. On 7 December, Achernar got underway for a brief period of trials and exercises in Chesapeake Bay. The ship returned to Norfolk on 11 December, took on cargo, and got underway on 18 December. She transited the Panama Canal on Christmas Day 1944 and arrived at Pearl Harbor on 10 January 1945.
+
  
 
[[Image:USS Virgo.jpg|right|300px|USS Virgo]]
 
[[Image:USS Virgo.jpg|right|300px|USS Virgo]]
  
Following tactical maneuvers off Oahu from 17 to 19 January, the cargo ship began loading cargo on 12 February and put to sea on the 18th. Achernar stopped at Eniwetok on 26 February, Kossol Roads on 4 March, and anchored in San Pedro Bay, Philippine Islands, from 15 to 20 March, before arriving off Okinawa on 1 April to support the seizure of that key island. At 0043 the next day, a Japanese suicide plane hit the attack cargo ship's starboard side; and, almost simultaneously, a bomb exploded on her port side. Fires broke out, and the ship began listing slightly to port. Achernar lost five crew members killed and 41 injured.
+
Following tactical maneuvers off Oahu from 17 to 19 January, the cargo ship began loading cargo on 12 February and put to sea on the 18th. Achernar stopped at [[Eniwetok]] on 26 February, Kossol Roads on 4 March, and anchored in San Pedro Bay, Philippine Islands, from 15 to 20 March, before arriving off [[Okinawa]] on 1 April to support the seizure of that key island. At 0043 the next day, a Japanese suicide plane hit the attack cargo ship's starboard side; and, almost simultaneously, a bomb exploded on her port side. Fires broke out, and the ship began listing slightly to port. Achernar lost five crew members killed and 41 injured.
  
+
By 0100, the fires were out and the list had been corrected. At 1525, the battered ship transferred her casualties to Solace (AH-5) and proceeded to anchor off Hagushi beach, where temporary repairs began. On the morning of 3 April, Achernar moved to Kerama Retto to begin unloading her cargo. She remained at Okinawa until 19 April, when she sailed for the United States via Ulithi and Pearl Harbor. The vessel arrived at [[San Francisco]] on 13 May and began offloading ammunition and fuel. Two days later, she entered drydock for repairs and overhaul. She got underway again on 10 July for shakedown along the California coast. On 4 August, Achernar left San Francisco to return to Pearl Harbor, where she arrived a week later and immediately began discharging her cargo. She was still in Hawaii when hostilities ended on the 15th. Achernar then shuttled personnel and equipment between Japan, various other [[Pacific]] islands, and took part in "Magic Carpet" operations, returning veterans to the United States.
  
By 0100, the fires were out and the list had been corrected. At 1525, the battered ship transferred her casualties to Solace (AH-5) and proceeded to anchor off Hagushi beach, where temporary repairs began. On the morning of 3 April, Achernar moved to Kerama Retto to begin unloading her cargo. She remained at Okinawa until 19 April, when she sailed for the United States via
+
On 28 November, Achernar arrived in [[Seattle]]. One week later, S.S. H. H. Raymond collided with her during a storm. As a result of the damage she sustained in the accident, Achernar entered drydock on 22 December for repairs.
  
+
Achernar got underway again on 16 January 1946 and resumed operations between the west coast and various ports in the Far East and the Pacific. When the Military Sea Transportation Service was formed on 1 October 1949, she was one of a group of attack cargo ships selected for service in the new organization. At the outbreak of the [[Korean War]], Achernar was completing overhaul at the Hunters Point Naval Shipyard. She got underway on 7 July 1950 and soon began onloading troops and cargo for transportation to the war zone. On the 14th, the ship joined TG 53.7 and sailed for [[Japan]]. She unloaded her cargo at [[Kobe]], [[Sasebo]], and [[Yokosuka]]. On 22 September, she left [[Japan]] and proceeded to [[Inchon]], [[Korea]], to support nearby ground operations.
  
Ulithi and Pearl Harbor. The vessel arrived at San Francisco on 13 May and began offloading ammunition and fuel. Two days later, she entered drydock for repairs and overhaul. She got underway again on 10 July for shakedown along the California coast. On 4 August, Achernar left San Francisco to return to Pearl Harbor, where she arrived a week later and immediately began discharging her cargo. She was still in Hawaii when hostilities ended on the 15th. Achernar then shuttled personnel and equipment between Japan, various other Pacific islands, and took part in "Magic Carpet" operations, returning veterans to the United States.
+
After American forces had liberated the territory near Inchon and [[Seoul]], elements of the 1st Marine Division and their equipment were loaded on board Achernar for landing on the east coast of Korea at Wonsan. She sailed as part of TG 90.2 and arrived in [[Wonsan]] on 25 October. She unloaded her passengers and proceeded to Moji, Japan, arriving there on 31 October. There, she took on men of the 2d Infantry Division for transportation to Wonsan. Following this mission, she returned to Yokosuka on 20 November.
 
+
+
 
+
On 28 November, Achernar arrived in Seattle. One week later, S.S. H. H. Raymond collided with her during a storm. As a result of the damage she sustained in the accident, Achernar entered drydock on 22 December for repairs.
+
 
+
+
 
+
Achernar got underway again on 16 January 1946 and resumed operations between the west coast and various ports in the Far East and the Pacific. When the Military Sea Transportation Service was formed on 1 October 1949, she was one of a group of attack cargo ships selected for service in the new organization. At the outbreak of the Korean War, Achernar was completing overhaul at the Hunters Point Naval Shipyard. She got underway on 7 July 1950 and soon began onloading troops and cargo for transportation to the war zone. On the 14th, the ship joined TG 53.7 and sailed for Japan. She unloaded her cargo at Kobe, Sasebo, and Yokosuka. On 22 September, she left Japan and proceeded to Inchon, Korea, to support nearby ground operations.
+
 
+
+
 
+
After American forces had liberated the territory near Inchon and Seoul, elements of the 1st Marine Division and their equipment were loaded on board Achernar for landing on the east coast of Korea at Wonsan. She sailed as part of TG 90.2 and arrived in Wonsan on 25 October. She unloaded her passengers and proceeded to Moji, Japan, arriving there on 31 October. There, she took on men of the 2d Infantry Division for transportation to Wonsan. Following this mission, she returned to Yokosuka on 20 November.
+
 
+
+
  
 
The attack cargo ship was then ordered to report back to the United States. She left Japan on 27 November accompanying Brush (DD-745) and Mansfield (DD-728)—both of which had been damaged by mines—ready to assist them, if necessary. They made brief stops at Midway and Pearl Harbor before reaching San Francisco on 17 December.
 
The attack cargo ship was then ordered to report back to the United States. She left Japan on 27 November accompanying Brush (DD-745) and Mansfield (DD-728)—both of which had been damaged by mines—ready to assist them, if necessary. They made brief stops at Midway and Pearl Harbor before reaching San Francisco on 17 December.
  
+
Following a short availability period, Achernar went to Port Hueneme, [[California]], on 18 January 1951 to onload cargo and personnel for transportation to the [[Aleutian Islands|Aleutians]]. After unloading at Amchitka, she visited Adak, Whittier, [[Alaska]], and Kodiak Island to pick up cargo to be returned to Seattle. On 17 March, Achernar set course for Norfolk. She transited the Panama Canal on the 26th; paused at Morehead City, [[North Carolina]], on 1 April; and finally arrived at Norfolk on 3 April. The ship was assigned to the Amphibious Force, Atlantic Fleet, and took part in various fleet exercises and cargo runs in the Caribbean and along the east coast. On 18 February 1956, Achernar was decommissioned; placed in reserve; and berthed at Orange, Tex.
 
+
Following a short availability period, Achernar went to Port Hueneme, Calif., on 18 January 1951 to onload cargo and personnel for transportation to the Aleutians. After unloading at Amchitka, she visited Adak, Whittier, Alaska, and Kodiak Island to pick up cargo to be returned to Seattle. On 17 March, Achernar set course for Norfolk. She transited the Panama Canal on the 26th; paused at Morehead City, N.C., on 1 April; and finally arrived at Norfolk on 3 April. The ship was assigned to the Amphibious Force, Atlantic Fleet, and took part in various fleet exercises and cargo runs in the Caribbean and along the east coast. On 18 February 1956, Achernar was decommissioned; placed in reserve; and berthed at Orange, Tex.
+
 
+
+
 
+
Achernar was placed back in commission at New Orleans on 1 September 1961. She arrived at Norfolk on 1 December 1961 and became a unit of Amphibious Squadron 6, Atlantic Fleet. Achernar held shakedown in the Caribbean and spent the remainder of her career conducting various training exercises in the Virginia capes operating area.
+
  
+
Achernar was placed back in commission at [[New Orleans]] on 1 September 1961. She arrived at Norfolk on 1 December 1961 and became a unit of Amphibious Squadron 6, Atlantic Fleet. Achernar held shakedown in the Caribbean and spent the remainder of her career conducting various training exercises in the Virginia capes operating area.
  
Achernar was placed out of commission on 1 July 1963 and transferred to the Maritime Administration. She was reacquired by the Navy on 29 January 1964 but saw no active service before she was transferred to the government of Spain on 2 February 1965. She served the Spanish Navy as Castilla (TA-21) until scrapped in 1982.<ref>Dictionary of American Naval Fighting Ships [http://www.history.navy.mil/danfs/a2-list.htm]</ref>
+
Achernar was placed out of commission on 1 July 1963 and transferred to the Maritime Administration. She was reacquired by the Navy on 29 January 1964 but saw no active service before she was transferred to the government of Spain on 2 February 1965. She served the Spanish Navy as Castilla (TA-21) until scrapped in 1982.<ref>[http://www.history.navy.mil/danfs/a2-list.htm Dictionary of American Naval Fighting Ships]</ref>
  
 
==References==
 
==References==
 
<references/>
 
<references/>
  
 +
{{DEFAULTSORT:Achernar, USS}}
 
[[Category:Ships]]
 
[[Category:Ships]]

Latest revision as of 01:37, June 28, 2016

Achernar (AKA-53) was laid down under a Maritime Commission contract (MC hull 208) on 6 September 1943 at Kearney, New Jersey, by the Federal Shipbuilding and Drydock Co.; launched on 3 December 1943; sponsored by Mrs. Adela Rogers St. John; acquired by the Navy on 29 January 1944; and commissioned on 31 January 1944, Comdr. H. R. Stevens in command.

Following conversion and fitting out at the New York Navy Yard, the attack cargo ship got underway on 28 February and held shakedown in the Chesapeake Bay. On 13 March, she arrived at Staten Island, New York—where she loaded cargo and embarked Army personnel for transportation to Great Britain— and stood out to sea on the 19th, with Convoy CU-18. She arrived at Swansea, Wales, on 30 March and spent the next two months transporting cargo and personnel between various ports in the United Kingdom in preparation for the Normandy invasion.

USS Achernar

The last week in May found Achernar in Plymouth, England. On 1 June, she was designated the 1st Army's headquarters ship. On 6 June, she steamed across the English Channel and, at 1609, anchored in her preassigned position in Baie de la Seine, France. For the next few days, she acted as a nerve center for troops fighting for a foothold in France. On 11 June, the 1st Army's headquarters disembarked; and, at 1148, Achernar got underway for England. After a three-day respite in Plymouth, the ship moved to Roseneath, Scotland, to take on the cargo and personnel of two construction battalions. On 19 June, she returned to Plymouth to onload materials to repair damaged assault craft and, on 22 June, got underway for the assault area in France. While on station, she underwent several enemy air attacks. The cargo ship again left the French coast on 29 June to return to England and arrived in Plymouth on 1 July. On 5 July, the ship was ordered to sail as a part of Task Group (TG) 120.6, which was bound for the Mediterranean to support the invasion of southern France. The ship entered the harbor at Oran, Algeria, on 10 July; but, six days later, sailed to Naples. After loading operations there, she switched to an anchorage at Castellamare, Italy, on 2 August. Here, she embarked personnel of the 36th Division and proceeded to sea on the 13th for the assault in southern France. On the morning of 15 August, her crew commenced discharging her cargo and sending it to the beaches. The next day, after finishing the delivery of cargo, she received casualties on board and embarked 13 German prisoners of war before getting underway at 2100 to return to Naples.

For the next two months, Achernar continued making trips from Naples and Oran to points along the southern coast of France. On 25 October, she sailed from Oran westward through the Strait of Gibraltar towards the United States. She arrived at Hampton Roads on 8 November and underwent repairs and overhaul at the Norfolk Navy Yard. On 7 December, Achernar got underway for a brief period of trials and exercises in Chesapeake Bay. The ship returned to Norfolk on 11 December, took on cargo, and got underway on 18 December. She transited the Panama Canal on Christmas Day 1944 and arrived at Pearl Harbor on 10 January 1945.

USS Virgo

Following tactical maneuvers off Oahu from 17 to 19 January, the cargo ship began loading cargo on 12 February and put to sea on the 18th. Achernar stopped at Eniwetok on 26 February, Kossol Roads on 4 March, and anchored in San Pedro Bay, Philippine Islands, from 15 to 20 March, before arriving off Okinawa on 1 April to support the seizure of that key island. At 0043 the next day, a Japanese suicide plane hit the attack cargo ship's starboard side; and, almost simultaneously, a bomb exploded on her port side. Fires broke out, and the ship began listing slightly to port. Achernar lost five crew members killed and 41 injured.

By 0100, the fires were out and the list had been corrected. At 1525, the battered ship transferred her casualties to Solace (AH-5) and proceeded to anchor off Hagushi beach, where temporary repairs began. On the morning of 3 April, Achernar moved to Kerama Retto to begin unloading her cargo. She remained at Okinawa until 19 April, when she sailed for the United States via Ulithi and Pearl Harbor. The vessel arrived at San Francisco on 13 May and began offloading ammunition and fuel. Two days later, she entered drydock for repairs and overhaul. She got underway again on 10 July for shakedown along the California coast. On 4 August, Achernar left San Francisco to return to Pearl Harbor, where she arrived a week later and immediately began discharging her cargo. She was still in Hawaii when hostilities ended on the 15th. Achernar then shuttled personnel and equipment between Japan, various other Pacific islands, and took part in "Magic Carpet" operations, returning veterans to the United States.

On 28 November, Achernar arrived in Seattle. One week later, S.S. H. H. Raymond collided with her during a storm. As a result of the damage she sustained in the accident, Achernar entered drydock on 22 December for repairs.

Achernar got underway again on 16 January 1946 and resumed operations between the west coast and various ports in the Far East and the Pacific. When the Military Sea Transportation Service was formed on 1 October 1949, she was one of a group of attack cargo ships selected for service in the new organization. At the outbreak of the Korean War, Achernar was completing overhaul at the Hunters Point Naval Shipyard. She got underway on 7 July 1950 and soon began onloading troops and cargo for transportation to the war zone. On the 14th, the ship joined TG 53.7 and sailed for Japan. She unloaded her cargo at Kobe, Sasebo, and Yokosuka. On 22 September, she left Japan and proceeded to Inchon, Korea, to support nearby ground operations.

After American forces had liberated the territory near Inchon and Seoul, elements of the 1st Marine Division and their equipment were loaded on board Achernar for landing on the east coast of Korea at Wonsan. She sailed as part of TG 90.2 and arrived in Wonsan on 25 October. She unloaded her passengers and proceeded to Moji, Japan, arriving there on 31 October. There, she took on men of the 2d Infantry Division for transportation to Wonsan. Following this mission, she returned to Yokosuka on 20 November.

The attack cargo ship was then ordered to report back to the United States. She left Japan on 27 November accompanying Brush (DD-745) and Mansfield (DD-728)—both of which had been damaged by mines—ready to assist them, if necessary. They made brief stops at Midway and Pearl Harbor before reaching San Francisco on 17 December.

Following a short availability period, Achernar went to Port Hueneme, California, on 18 January 1951 to onload cargo and personnel for transportation to the Aleutians. After unloading at Amchitka, she visited Adak, Whittier, Alaska, and Kodiak Island to pick up cargo to be returned to Seattle. On 17 March, Achernar set course for Norfolk. She transited the Panama Canal on the 26th; paused at Morehead City, North Carolina, on 1 April; and finally arrived at Norfolk on 3 April. The ship was assigned to the Amphibious Force, Atlantic Fleet, and took part in various fleet exercises and cargo runs in the Caribbean and along the east coast. On 18 February 1956, Achernar was decommissioned; placed in reserve; and berthed at Orange, Tex.

Achernar was placed back in commission at New Orleans on 1 September 1961. She arrived at Norfolk on 1 December 1961 and became a unit of Amphibious Squadron 6, Atlantic Fleet. Achernar held shakedown in the Caribbean and spent the remainder of her career conducting various training exercises in the Virginia capes operating area.

Achernar was placed out of commission on 1 July 1963 and transferred to the Maritime Administration. She was reacquired by the Navy on 29 January 1964 but saw no active service before she was transferred to the government of Spain on 2 February 1965. She served the Spanish Navy as Castilla (TA-21) until scrapped in 1982.[1]

References

  1. Dictionary of American Naval Fighting Ships