Difference between revisions of "Belknap-II"

From Conservapedia
Jump to navigation Jump to search
(New page: The second Belknap (DLG-26), later redesignated CG-26 was launched on 20 July 1963 by Bath Iron Works Corp., and commissioned on 7 November 1964. She was decommissioned on 15 February 1995...)
 
(→‎top: clean up & uniformity)
 
Line 1: Line 1:
−
The second Belknap (DLG-26), later redesignated CG-26 was launched on 20 July 1963 by Bath Iron Works Corp., and commissioned on 7 November 1964. She was decommissioned on 15 February 1995 and struck from the Navy list on the same date. Belknap was disposed of in support of a fleet training exercise on 24 September 1998.<ref>Dictionary of American Naval Fighting Ships [http://www.history.navy.mil/danfs/b4-list.htm]</ref>
+
The second Belknap (DLG-26), later redesignated CG-26 was launched on 20 July 1963 by Bath Iron Works Corp., and commissioned on 7 November 1964. She was decommissioned on 15 February 1995 and struck from the Navy list on the same date. Belknap was disposed of in support of a fleet training exercise on 24 September 1998.<ref>[http://www.history.navy.mil/danfs/b4-list.htm Dictionary of American Naval Fighting Ships]</ref>
  
 
See also [[Belknap-I]].
 
See also [[Belknap-I]].

Latest revision as of 00:14, June 28, 2016

The second Belknap (DLG-26), later redesignated CG-26 was launched on 20 July 1963 by Bath Iron Works Corp., and commissioned on 7 November 1964. She was decommissioned on 15 February 1995 and struck from the Navy list on the same date. Belknap was disposed of in support of a fleet training exercise on 24 September 1998.[1]

See also Belknap-I.

References