Difference between revisions of "Baseline"
(Added category and references) |
DavidB4-bot (talk | contribs) m (→top: HTTP --> HTTPS [#1], replaced: http://www.senate.gov → https://www.senate.gov) |
||
| (2 intermediate revisions by 2 users not shown) | |||
| Line 1: | Line 1: | ||
| − | + | A '''baseline''' is a projection of the receipts, outlays, and other [[budget]] amounts that would ensue in the future without any change in existing policy. Baseline projections are used to gauge the extent in which proposed [[legislation]], if enacted into law, would alter current spending and revenue levels.<ref>[https://www.senate.gov/reference/glossary_term/baseline.htm] US Senate Reference</ref> | |
==References== | ==References== | ||
<references/> | <references/> | ||
| − | [[Category: | + | [[Category:United States Senate Terms]] |
Latest revision as of 13:43, September 26, 2018
A baseline is a projection of the receipts, outlays, and other budget amounts that would ensue in the future without any change in existing policy. Baseline projections are used to gauge the extent in which proposed legislation, if enacted into law, would alter current spending and revenue levels.[1]