Construction Differential Subsidy
This is an old revision of this page, as edited by EdBot (talk | contribs) at 22:22, April 6, 2008. It may differ significantly from current revision.
The Construction Differential Subsidy was a program whereby the United States government attempted to offset the higher shipbuilding cost in the U.S. by paying up to 50% of the difference between cost of U.S. and non-U.S. construction. The difference went to the U.S. shipyard. It is unfunded since 1982.[1]