Changes

37 bytes added ,  03:43, December 21, 2007
m
Default sort
Line 1: Line 1: −
Achelous (ARL-1) was laid down as LST-10 at [[Pittsburgh]], [[Pennsylvania]], on 15 August 1942 by the Dravo Corp.; launched on 25 November 1942; sponsored by Mrs. George F, Wolfe, the wife of the chief engineer of the Dravo Corp.; named Achelous and redesignated ARL—1 on 13 January 1943; and commissioned at [[Baltimore]], [[Maryland]], on 2 April 1943, Capt. B. N. Ward in temporary command.
+
'''Achelous (ARL-1)''' was laid down as LST-10 at [[Pittsburgh]], [[Pennsylvania]], on 15 August 1942 by the Dravo Corp.; launched on 25 November 1942; sponsored by Mrs. George F, Wolfe, the wife of the chief engineer of the Dravo Corp.; named Achelous and redesignated ARL—1 on 13 January 1943; and commissioned at [[Baltimore]], [[Maryland]], on 2 April 1943, Capt. B. N. Ward in temporary command.
    
Later that day, command of the landing craft repair ship passed to Lt. Walter Ringies. Achelous held shakedown in Chesapeake Bay; stopped at Norfolk, [[Virginia]], on 22 April to take on supplies on 28 April; and sailed on the 28th with a convoy bound for North Africa. She paused in [[Bermuda]] from 2 to 9 May and arrived in Oran, [[Algeria]], on 26 May.
 
Later that day, command of the landing craft repair ship passed to Lt. Walter Ringies. Achelous held shakedown in Chesapeake Bay; stopped at Norfolk, [[Virginia]], on 22 April to take on supplies on 28 April; and sailed on the 28th with a convoy bound for North Africa. She paused in [[Bermuda]] from 2 to 9 May and arrived in Oran, [[Algeria]], on 26 May.
Line 18: Line 18:  
<references/>
 
<references/>
    +
{{DEFAULTSORT: Achelous, USS}}
 
[[Category:Ships]]
 
[[Category:Ships]]
5,580

edits