Four-day week

From Conservapedia
This is the current revision of Four-day week as edited by JamesWilson (Talk | contribs) at 12:17, October 2, 2011. This URL is a permanent link to this version of this page.

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

The four-day workweek can be efficient for some manufacturing operations. For example, Kyanize paint company increased productivity from 15 batches a week to 16 batches a week, while actually saving money - and, by the way, increasing employee morale. Instead of making 3 batches of paint Monday through Friday (3 x 5 = 15), they made 4 batches of paint Monday through Thursday (4 x 4 = 16).

Books