USS Admiral D. W. Taylor (AP-128)
From Conservapedia
This is an old revision of this page, as edited by BethanyS (Talk | contribs) at 13:06, July 11, 2007. It may differ significantly from current revision.
Admiral D. W. Taylor (AP-128)—projected as an Admiral W. S. Benson-class transport—was laid down on 28 August 1944 at Alameda, Calif., by the Bethlehem Alameda Shipyard, Inc., under a Maritime Commission contract (MC hull 686). However, her acquisition by the Navy was cancelled on 16 December 1944. Nevertheless, the ship was completed after the war; and she was operated by the American President Lines for the Maritime Commission as SS President Cleveland.[1]