| − | After fitting out and completing sea trials at Long Beach Naval Shipyard, Barbey got underway on 4 February 1973 for shakedown training in the Hawaiian Islands. Before post-shakedown availability at Long Beach, which commenced on 12 May, the ship enjoyed a three-day liberty at Acapulco, Mexico, plane guarded for Hancock (CVA-19) and conducted acoustic tests at Seattle. The availability included a drydock period from 5 June to 9 October during which workers at Long Beach Naval Shipyard modified her flight deck and hangar to accommodate a light airborne multi-purpose system (LAMPS) helicopter and installed an experimental controllable pitch propeller (CPP). Testing and adjusting the new propeller system occupied the ship through January of 1974. | + | After fitting out and completing sea trials at Long Beach Naval Shipyard, Barbey got underway on 4 February 1973 for shakedown training in the [[Hawaiian Islands]]. Before post-shakedown availability at Long Beach, which commenced on 12 May, the ship enjoyed a three-day liberty at Acapulco, Mexico, plane guarded for Hancock (CVA-19) and conducted acoustic tests at Seattle. The availability included a drydock period from 5 June to 9 October during which workers at Long Beach Naval Shipyard modified her flight deck and hangar to accommodate a light airborne multi-purpose system (LAMPS) helicopter and installed an experimental controllable pitch propeller (CPP). Testing and adjusting the new propeller system occupied the ship through January of 1974. |