:AFC = FC / Q , which is the fixed cost per unit of the good produced. For example, if the fix cost of the pizza palor (just the building, cooking equipment, and utensils such as forks and spoons) is $300 per day, then the average fixed cost (AFC) is $300 / 100 = $3 per pizza. | :AFC = FC / Q , which is the fixed cost per unit of the good produced. For example, if the fix cost of the pizza palor (just the building, cooking equipment, and utensils such as forks and spoons) is $300 per day, then the average fixed cost (AFC) is $300 / 100 = $3 per pizza. |