The bridge is built of fabricated [[steel]], and is painted with an orange color that protects the Bridge's steel components from rust and corrosion caused by the high salt content in the air from the Pacific Ocean.<ref>http://goldengatebridge.org/</ref> The construction of the bridge took four years to complete (Jan 1933 - May 1937) at a cost of $35 million dollars.<ref>http://www.inetours.com/Pages/SFNbrhds/Golden_Gate_Bridge.html</ref>
+
The bridge is built of fabricated [[steel]], and is painted with an orange color that protects the Bridge's steel components from rust and corrosion caused by the high salt content in the air from the Pacific Ocean.<ref>http://goldengatebridge.org/</ref> The construction of the bridge took four years to complete (Jan 1933 - May 1937) at a cost of $35 million.<ref>http://www.inetours.com/Pages/SFNbrhds/Golden_Gate_Bridge.html</ref>
    
The 6 traffic lanes of the bridge are located on one level, and have  
 
The 6 traffic lanes of the bridge are located on one level, and have  
Line 78: Line 78:  
Construction began in August 1997 and is tentatively scheduled to be  
 
Construction began in August 1997 and is tentatively scheduled to be  
 
completed by 2014. The retrofit project is currently (as of March 2013) in Phase 3, the final phase of construction.<ref>http://goldengatebridge.org/projects/retrofit.php</ref> The total cost of the retrofit is estimated to be  
 
completed by 2014. The retrofit project is currently (as of March 2013) in Phase 3, the final phase of construction.<ref>http://goldengatebridge.org/projects/retrofit.php</ref> The total cost of the retrofit is estimated to be  
−
around $405 million dollars. Once completed, the bridge should be able to withstand an 8.3 magnitude earthquake.<ref>http://goldengate.org/news/bridge/GGBSeismicStatusApr2006.php  
+
around $405 million. Once completed, the bridge should be able to withstand an 8.3 magnitude earthquake.<ref>http://goldengate.org/news/bridge/GGBSeismicStatusApr2006.php  
 