The bridge is named after its designer and builder, James Buchanan Eads, who was self-taught and widely ridiculed. This was the first bridge he had ever built! Construction began in 1868 under his supervision with his then-controversial design, and was completed in 1874. The river is wide and a very deep 103 feet there, because it is below the Mississippi-Missouri confluence. But Eads implemented innovative construction including the first use of pneumatic caissons in the United States for the underwater construction, and above the surface he used what became the cantilever technique.<ref>https://study.com/academy/lesson/eads-bridge-construction-facts.html</ref> | The bridge is named after its designer and builder, James Buchanan Eads, who was self-taught and widely ridiculed. This was the first bridge he had ever built! Construction began in 1868 under his supervision with his then-controversial design, and was completed in 1874. The river is wide and a very deep 103 feet there, because it is below the Mississippi-Missouri confluence. But Eads implemented innovative construction including the first use of pneumatic caissons in the United States for the underwater construction, and above the surface he used what became the cantilever technique.<ref>https://study.com/academy/lesson/eads-bridge-construction-facts.html</ref> |