Changes

Jump to navigation Jump to search
28 bytes added ,  23:31, September 16, 2023
Spelling, grammar, and general cleanup
Line 2: Line 2:     
In [[Oregon]] the largest dam removal project ever is ongoing:
 
In [[Oregon]] the largest dam removal project ever is ongoing:
 +
 +
==References==
 +
{{Reflist}}
 
{{cquote|The simultaneous removal of the four dams, with a combined height of 411ft (125m), makes it the largest dam removal project in America’s history, according to the Klamath River Renewal Corporation, the nonprofit tasked with overseeing the dam removals. It is also set to be the most expensive, at a cost of almost $450m (£340m).<ref>https://www.bbc.com/future/article/20201110-the-largest-dam-removal-project-in-american-history</ref>}}
 
{{cquote|The simultaneous removal of the four dams, with a combined height of 411ft (125m), makes it the largest dam removal project in America’s history, according to the Klamath River Renewal Corporation, the nonprofit tasked with overseeing the dam removals. It is also set to be the most expensive, at a cost of almost $450m (£340m).<ref>https://www.bbc.com/future/article/20201110-the-largest-dam-removal-project-in-american-history</ref>}}
−
[[category:energy]]
+
[[Category:Energy]]
−
[[category:environmentalism]]
+
[[Category:Environmentalism]]
−
[[category:water]]
+
[[Category:Water]]
Block, SkipCaptcha, apieditor, Automoderated users, Bots, edit, ratelimit-exempt
59,556

edits

Navigation menu