Changes

Jump to navigation Jump to search
No change in size ,  01:37, November 16, 2007
m
Line 16: Line 16:  
The railway system is broad gauge (5' 3") and electrified at 1500 volts D.C. on overhead wires.
 
The railway system is broad gauge (5' 3") and electrified at 1500 volts D.C. on overhead wires.
 
It is a radial system based on the inner city, with [[underground]] lines around the central business district allowing services from most lines to serve all the CBD's five [[station]]s.
 
It is a radial system based on the inner city, with [[underground]] lines around the central business district allowing services from most lines to serve all the CBD's five [[station]]s.
−
Services operate seven days a week, from around 5 a.m. to midnight or most days, and generally with 15 or 20-minute frequencies in off-peak times, and more frequently in peak times.
+
Services operate seven days a week, from around 5 a.m. to midnight on most days, and generally with 15 or 20-minute frequencies in off-peak times, and more frequently in peak times.
    
Melbourne's tram system is standard gauge (4' 8½") and electrified at 600 volts D.C. on overhead wires.
 
Melbourne's tram system is standard gauge (4' 8½") and electrified at 600 volts D.C. on overhead wires.
nsTeam2RO, nsTeam2RW, nsTeam2_talkRO, nsTeam2_talkRW
13,254

edits

Navigation menu