Changes

Jump to navigation Jump to search
3,559 bytes added ,  23:58, April 1, 2010
expansion
Line 2: Line 2:  
The '''London Underground''' (often referred to as "The Tube") is London's [[Subway|underground railway system]]. Many lines in the outskirts are at or above ground level.
 
The '''London Underground''' (often referred to as "The Tube") is London's [[Subway|underground railway system]]. Many lines in the outskirts are at or above ground level.
   −
It is comprised of the Bakerloo, Central, Circle, District, Hammersmith & City, Jubilee, Metropolitan, Northern, Piccadilly (serves [[London Heathrow Airport|Heathrow Airport]]), Victoria and Waterloo & City lines.
+
It is comprised of 11 lines - Bakerloo, Central, Circle, District, Hammersmith & City, Jubilee, Metropolitan, Northern, Piccadilly (serves [[London Heathrow Airport|Heathrow Airport]]), Victoria and Waterloo & City lines.
    
The London underground is the oldest subway system in the world.
 
The London underground is the oldest subway system in the world.
 +
 +
==Bakerloo Line==
 +
A deep level line, it is one of the five lines that serves destinations south of the Thames, running from Elephant & Castle to Harrow & Wealdstone. Most of the subterranean section was built in the 19th century at the same time as one of the cities main sewers, after which it is named. It is also one of the few stations to have a fully underground terminus, at Elephant and Castle. A long stretch of the northern section of the route runs on the Watford DC line, and shares the track with heavy rail commuter services. There are much talked about but unfunded plans to extend the tunnels south-east to Lewisham and take over the Hayes branch line.
 +
 +
==Central Line==
 +
A deep level line, the Central runs though the very centre of the City of London east to west, and is the longest line on the network by some margin. It is one of the most important lines on the network, and one of the most varied. A major bottleneck is the oldest subterranean section between Liverpool Street and St. Paul's where the narrow tunnels (11ft6" wide in parts) and extremely tight turns drastically reduces the operating speed of trains. However the line received massive investment in the early 90's, and an automatic "driverless" system (though an operator is still present in the cab at all times) means services can operative with a service interval of every 1-2minutes. At the time of the redevelopment, the little used Ongar extension, far beyond London boundaries in rural Essex and operated as a separate, very basic shuttle service, was abandoned. Subsequent overcrowding of the current terminus in Epping has led to proposals to redevelop the extension to the same standards as the rest of the line and reopen it to through trains from the rest of the line. The line runs from Ruislip in the north-western edge of Greater London to Epping in Essex. A short branch also serves Ealing in inner west London. 
 +
 +
==Circle Line==
 +
The Circle line is a "virtual" line on the system that has no actual track. It's coloured yellow on the map and, contrary to it's name, actually forms a spiral shape.
 +
 +
==District Line==
 +
This line is one of the most complex on the system. It is a sub-surface line that as built via cut and cover methods, causing massive disruption to city inhabitants, and thus many delays in construction, as it passes through areas belonging to wealthy landowners who resisted its development. It runs east to west, passing through the southern edge of the city centre, immediately north of the Thames. Like the Bakerloo line, some of it's alignment follows a sewerage system built at the same time known as the Embankment, from which one station takes it's name. It runs from a single eastern terminus at Upurminister to Earls Court, where a short single track spur leads to Olympia and Edgeware Road. The line also continues west, where one branch heads to Wimbledon, following a heavy rail alignment with separate tracks. This branch is runs at maximum capacity and is a major bottleneck. Another branch runs to Ealing, and a final route heads further west still, before turning south to Richmond, sharing tracks with heavy rail on the final southern alignment. The Richmond-Gunnersbury section of this route was to be withdrawn and capacity released to allow a branch of the new Crossrail line to serve Richmond, but residents blocked the proposal, fearing government intervention and micromanagement of the Crossrail project will leave it unfinished or badly delayed, and leave Richmond residents with no mass transit service.
    
==External Link==
 
==External Link==
106

edits

Navigation menu