Changes

No change in size ,  16:27, June 27, 2016
→‎top: Spell Check, typos fixed: foot ball → football, enroute → en route
Line 8: Line 8:       −
In late June, Barbey joined Plunger (SSN-595) for three days of operations near Seattle before returning to San Diego on the 28th. On 12 July, the destroyer escort departed the west coast for several weeks of refresher training in Hawaii, her crew honing their antisubmarine warfare skills enroute. On 30 August, following her return to San Diego, Barbey lost all of the blades of the CPP during tests and had to be towed by Florikan (ARS-9) to Long Beach Naval Shipyard.
+
In late June, Barbey joined Plunger (SSN-595) for three days of operations near Seattle before returning to San Diego on the 28th. On 12 July, the destroyer escort departed the west coast for several weeks of refresher training in Hawaii, her crew honing their antisubmarine warfare skills en route. On 30 August, following her return to San Diego, Barbey lost all of the blades of the CPP during tests and had to be towed by Florikan (ARS-9) to Long Beach Naval Shipyard.
      −
During the first six months of 1975, the warship reinstalled the CPP and subjected the new propeller to extensive trials at sea. During late May and early June, she interrupted this routine to undergo refresher training at Pearl Harbor prior to returning to San Diego. On 30 June 1975, Barbey and all other destroyer escorts were reclassified frigates, and she was redesignated FF-1088. Local operations, training, and upkeep kept the ship busy until 17 November when she commenced removal of the equipment associated with CNO project DS 523 (the 35-foot ball). During the first five days of December, Barbey conducted sonar sound trials and engineering drills before serving as an engineering and ASW school for most of the ensuing two weeks.
+
During the first six months of 1975, the warship reinstalled the CPP and subjected the new propeller to extensive trials at sea. During late May and early June, she interrupted this routine to undergo refresher training at Pearl Harbor prior to returning to San Diego. On 30 June 1975, Barbey and all other destroyer escorts were reclassified frigates, and she was redesignated FF-1088. Local operations, training, and upkeep kept the ship busy until 17 November when she commenced removal of the equipment associated with CNO project DS 523 (the 35-football). During the first five days of December, Barbey conducted sonar sound trials and engineering drills before serving as an engineering and ASW school for most of the ensuing two weeks.
     
Block, SkipCaptcha, apieditor, Automoderated users, Bots, edit, ratelimit-exempt
58,417

edits