Disposal of nuclear waste is the most problematic issue facing the nuclear industry beyond the problem of proliferation. Rosatom has opted to reprocess highly radioactive spent fuel from its foreign plants. The radioactive waste must be cooled onsite for years before it can be transported. The transport of waste itself puts communities along the route at risk, and the final reprocessing generates an even greater volume of radioactive wastes. Reprocessing has been rejected in some nations, such as the United States. Reprocessing increases the volume of radioactive wastes and is a direct pathway to the production of separated weapons grade plutonium.
 
Disposal of nuclear waste is the most problematic issue facing the nuclear industry beyond the problem of proliferation. Rosatom has opted to reprocess highly radioactive spent fuel from its foreign plants. The radioactive waste must be cooled onsite for years before it can be transported. The transport of waste itself puts communities along the route at risk, and the final reprocessing generates an even greater volume of radioactive wastes. Reprocessing has been rejected in some nations, such as the United States. Reprocessing increases the volume of radioactive wastes and is a direct pathway to the production of separated weapons grade plutonium.
   −
Blending, on the other hand, is the recycling of nuclear weapons material into nuclear fuel for power plants. In 1992, the United States and Russia signed the  HEU-LEU treaty (also called "Megatons into Megawatts"), in which highly enriched uranium extracted from disassembled Russian warheads was blended into low-enriched uranium and sent to American nuclear power plants. In coming years the program fueled ten percent of U.S. electricity. Tenex (Techsnabexport) is the Rosatom subsidiary responsible for the sale and transportation of this uranium to the United States. Tenex maintained its presence in the United States under the name Tenam, established about October 2010, based in Bethesda MD. The HEU-LEU contract worth more than $13 billion terminated in 2013.  
+
Blending, on the other hand, is the recycling of nuclear weapons material into nuclear fuel for power plants. In 1992, the United States and Russia signed the  HEU-LEU treaty (also called "Megatons into Megawatts"), in which highly enriched uranium extracted from disassembled Russian warheads was blended into low-enriched uranium and sent to [[American]] [[nuclear power]] plants. In coming years the program fueled ten percent of [[U.S.]] [[electricity]].  
    
===Tenex===
 
===Tenex===
−
Tenex (Techsnabexport) is the Rosatom subsidiary responsible for the sale and transportation of uranium to the United States.
+
 
 +
Tenex (Techsnabexport) is the Rosatom subsidiary responsible for the sale and transportation of reprocessed uranium from Russian warheads to the [[United States]]. Tenex maintained its presence in the United States under the name Tenam, established about October 2010, based in Bethesda MD. The HEU-LEU contract worth more than $13 billion terminated in 2013.  
    
Vadim Mikerin was a Director of the Pan American Department of Tenex from about 2004 through about 2010, and was the President of Tenam from about October 2010 through about October 2014. Tenam serviced 19 contracts, directly and indirectly, with 12 American energy companies<!--totaling approximately $5.8 billion at the time of their termination under the sanctions-->. As Tenam's director Mikerin had tremendous leverage over American companies in an extortion scheme that awarded contracts to transport uranium in exchange for kick-backs.<ref>"In a highly competitive environment, it is difficult to hide unreasonable payments. Competitors and colleagues will certainly inform law enforcement agencies. Our people forget that in the United States they are in other conditions - there they will not reckon with their status and the importance of contracts, "- says former Russian Prosecutor General Yuri Skuratov.</ref>
 
Vadim Mikerin was a Director of the Pan American Department of Tenex from about 2004 through about 2010, and was the President of Tenam from about October 2010 through about October 2014. Tenam serviced 19 contracts, directly and indirectly, with 12 American energy companies<!--totaling approximately $5.8 billion at the time of their termination under the sanctions-->. As Tenam's director Mikerin had tremendous leverage over American companies in an extortion scheme that awarded contracts to transport uranium in exchange for kick-backs.<ref>"In a highly competitive environment, it is difficult to hide unreasonable payments. Competitors and colleagues will certainly inform law enforcement agencies. Our people forget that in the United States they are in other conditions - there they will not reckon with their status and the importance of contracts, "- says former Russian Prosecutor General Yuri Skuratov.</ref>
Block, Siteadmin, SkipCaptcha, Upload, Automoderated users, delete, edit, move, protect, rollback, Administrators, template