Changes
H&C and Jubilee lines
==District Line==
This line is one of the most complex on the system. It is a sub-surface line that as built via cut and cover methods, causing massive disruption to city inhabitants, and thus many delays in construction, as it passes through areas belonging to wealthy landowners who resisted its development. It runs east to west, passing through the southern edge of the city centre, immediately north of the Thames. Like the Bakerloo line, some of it's alignment follows a sewerage system built at the same time known as the Embankment, from which one station takes it's name. It runs from a single eastern terminus at Upurminister to Earls Court, where a short single track spur leads to Olympia and Edgeware Road. The line also continues west, where one branch heads to Wimbledon, following a heavy rail alignment with separate tracks. This branch is runs at maximum capacity and is a major bottleneck. Another branch runs to Ealing, and a final route heads further west still, before turning south to Richmond, sharing tracks with heavy rail on the final southern alignment. The Richmond-Gunnersbury section of this route was to be withdrawn and capacity released to allow a branch of the new Crossrail line to serve Richmond, but residents blocked the proposal, fearing government intervention and micromanagement of the Crossrail project will leave it unfinished or badly delayed, and leave Richmond residents with no mass transit service.
==Hammersmith & City Line==
A sub-surface line built via cut and cover, the route of this line encompasses the oldest sections of the network, dating to the 1860's. Today its one of the least crowded lines on the network, as most of it's route is also served by other lines on shared track. It runs on a north east to south west alignment, running from Barking in the east, to Hammersmith in the west. Despite the name, the line only skirts the historic Square Mile of the City of London, stopping at Liverpool Street, Farringdon and Moorgate, roughly following the alignment of the Roman era boundary of the city for this stretch. The Barking to Aldgate East stretch of the route is shared with the District Line, and Liverpool Street to Baker Street is shared with the Metropolitan Line. The Shepherds Bush line is coloured pink on the map, in reference to the artistic and gay friendly Shepherd's Bush area, which it serves. Along with the District Line, it will be one of the first Underground lines to receive air conditioned trains.
==Jubilee Line==
The newest line on the network, with the Stanmore to Charing Cross section opening in the 1970's. The southern/eastern section from Green Park to Stratford opened in 1999, in time for the Millennium Dome exhibition in North Greenwich. The Charing Cross section closed at this point, to allow for the new alignment, although the (now) branch line is kept in fully serviceable condition and has been proposed as a possible routing for a future DLR service. The new section of the line is radically different to the older 70's section, and every other line on the Underground. It has platform screen doors on the subterranean stations, and extremely large, futuristic stations featuring smooth brushed metal and smooth, minimalist concrete architectural style. the stations are designed to allow easy upgrading of the service and to handle much higher passenger volumes. The station at Canary Wharf, in the new financial district has been likened to a cathedral, whilst the station at North Greenwich can handle 20,000 passengers per hour. The line is the only one to have a direct interchange with all other Underground lines. When first proposed in the 70's, it was to be called the Fleet line after an underground London river, and was originally to be coloured grey, in association with the Royal Navy. It was changed to the Jubilee name prior to opening, to celebrate the Silver Jubilee of HRH Queen Elizabeth II, and the grey shade was altered to silver.
==External Link==