Difference between revisions of "Gotthard Base Tunnel"
Jump to navigation
Jump to search
m (cats) |
|||
| Line 3: | Line 3: | ||
==Notes== | ==Notes== | ||
<references /> | <references /> | ||
| + | [[Category:Tunnels]] | ||
| + | [[Category:Switzerland]] | ||
Revision as of 13:41, October 5, 2011
Gotthard Base Tunnel runs 57 kilometers (around 35 miles) through the Swiss Alps, and it was completed after 6 decades of work in 2010.[1]