Changes

m
no edit summary
Line 19: Line 19:     
==US Rte 109 NY ==
 
==US Rte 109 NY ==
−
A new US Rte. 109 would start at the existing US Rte. 9 at the Latham NY Traffic Circle and traveling with the Troy-Schenectady Rd until it crosses the NEW Colonie/Clifton Park NY bridge across the Mohawk A new road would built on the Northside of the Mohawk River to connect the new bridge to Vischer Ferry Rd and then it would travel along Vischer Ferry Rd till it reaches NY Rte. 146 and then the new US Rte. 109 would travel with Rte. 146 until in ends on the existing US Rte. 9. <ref>[ https://www.saratogian.com/opinion/letter-new-bridge-across-the-mohawk-river-needed/article_57b255f0-bd03-11e8-a2f3-d355cd73a3ec.html"  New Bridge "]</ref>
+
A new US Rte. 109 would start at the existing US Rte. 9 at the Latham NY Traffic Circle and traveling with the Troy-Schenectady Rd until it crosses the Mohawk River via a NEW bridge. A new road would built on the Northside of the Mohawk River to connect the new bridge to Vischer Ferry Rd and then it would travel along Vischer Ferry Rd till it reaches NY Rte. 146 and then the new US Rte. 109 would travel with Rte. 146 until in ends on the existing US Rte. 9 <ref>[ https://www.saratogian.com/opinion/letter-new-bridge-across-the-mohawk-river-needed/article_57b255f0-bd03-11e8-a2f3-d355cd73a3ec.html"  New Bridge "]</ref> <ref>https://www.newyorkalmanack.com/2023/04/a-bridge-at-vischer-ferry-some-clifton-park-history/"History of bridge"</ref>.
 +
 
 
==US Rte 287 TX ==
 
==US Rte 287 TX ==
 
Improvements to US 287 through Ellis County, a distance of approximately 32 miles. This would require the construction of continuous, one-way frontage roads, including grade separations and access control to the main highway.
 
Improvements to US 287 through Ellis County, a distance of approximately 32 miles. This would require the construction of continuous, one-way frontage roads, including grade separations and access control to the main highway.
SkipCaptcha, Automoderated users, edit
2,364

edits